Free delivery Australia-wideGST included in every priceWaterMark · GasMark certified
Home/FAQ/Installation & licensing
FAQ · Installation & licensing

Installation, licensing & compliance

The most important part of a hot water purchase. Please read this section carefully.

9 questions answered Updated October 2026 Adelaide, South Australia
01Do you install the equipment?

No — Ginkgo Australia supplies the equipment only. Installation is arranged by you, with a licensed gas fitter for gas models, or a licensed electrician plus a licensed plumber for the heat pump. That keeps the price at RRP and means you can use whichever reputable tradesperson you prefer.

02What licences does my installer need?
  • Gas models — a licensed gas fitter with the appropriate gas supply endorsement for the work being done (including a Type A appliance connection where required) and a current business licence for gas work in your state or territory.
  • Heat pump — a licensed electrician for the electrical connection and a licensed plumber for the water pipework, drain and isolation valve work.

Ask for their licence details before booking and keep them with your paperwork.

03Do I need a permit or approval for the installation?

Usually yes. A new or modified gas connection typically needs a permit or approval from your gas distributor (APA Gas, Origin, AGL, Jemena, and others), and plumbing approvals where a new water connection is made. Your installer lodges these on your behalf — that’s part of the job, not an extra.

04Which standards must the installation meet?

AS/NZS 3500.1 (plumbing installations), AS/NZS 3500.2 (gas installations), AS/NZS 2918 (gas appliances), AS 5601 (gas installation and operation) and AS/NZS 2712 for the heat pump range — always alongside the manufacturer’s installation manual. Every Ginkgo unit is WaterMark and GasMark certified (heat pumps under WaterMark WM-026973), and the All-in-One heat pumps also carry SAA electrical safety approval (SAA-261138-EA) under the RCM.

05What should I prepare before the installer arrives?
  • Clear wall space for the unit, including the clearances required by the manual
  • A capped gas point (gas models) or an appropriately rated electrical circuit (heat pump)
  • Accessible hot and cold water pipework and a drain
  • A copy of the installation manual and warranty document
  • Access to the water heater location for the duration of the work
06How long does installation take?

A straightforward swap over of an existing unit is usually a few hours. A brand-new installation, including new gas or electrical rough-in, can take a full day. Your tradesperson will give you a realistic time on site.

07How much does installation cost?

Installation labour is quoted by your licensed tradesperson and varies by state, complexity and access. Ginkgo does not set, control or collect it. Get two or three quotes and check that the quote includes permit fees, disconnection of the old unit, and commissioning.

08Can I install it myself, or use an unlicensed tradesperson?

No. Gas and electrical work must be done by a licensed tradesperson with the correct endorsements — it is unlawful in every Australian state and territory. Beyond the legal risk, a non-compliant install can void your warranty, disqualify you from STC certificates, and leave your insurance unable to respond after a claim.

09What should I do once installation is finished?

Ask your installer for: the compliance certificate and permit approvals they lodged, a commissioning check of the unit (gas pressure, temperature, anode and safety controls), and — for the heat pump — confirmation that the STC certificates have been created and assigned. Store these with the warranty document.

Still need help?

Real people, real answers — Adelaide based, Monday to Friday.

Other FAQ topics

Browse all FAQs →

Ready to buy or need a hand choosing?

Buy your Ginkgo system online at the recommended retail price (incl. GST) and arrange licensed installation yourself — or get a free, no-obligation quote and we’ll size it for you.

Scroll to Top